ECOLOGY AND ENVIRONMENT

  • Primary aim certification in A class
  • Every single light bulb used in the space is led
  • Water saving bathroom plumbing system
  • Excellent natural to artificial light ratio
  • External air exchange with constant temperature and humidity
  • Filtering screen roller blinds

TECHNOLOGICAL SYSTEMS

  • Building with structured wiring
  • One tower per workstation, with data line, audio, driver and UPS with full modulation
  • Technical rooms distributed over the floors, with adequate HVAC, equipped with private rack cabinets to house switches, with optic cable incoming from the technical room on the lower-ground floor.
  • The technical rooms in which the outside fibre optic lines arrive are equipped with smoke detection and fire prevention systems, fitted in the ceiling and under the floor, HVAC, alarm, electrical panel and adequate lines
  • Hot-water central heating
  • Heating and air-conditioning supplied by dual battery fan coils which allow both flows in circulation managed by valves for optimal temperature regulation.

MANAGEMENT OF BUILDING SERVICES

  • Permanent supervision 8 hours a day on working days
  • Availability day, night and on holidays

LIFT SYSTEMS

  • 2 goods lifts with a capacity of 1,500 kg, directly accessible from the garages and warehouses
  • 6 passenger lifts

ELECTRICAL AND SPECIAL SYSTEMS

  • Safety lighting
  • Optical sensor smoke detection

SECURITY SYSTEMS

  • Anti-intrusion system with access control
  • Video-surveillance 24/7